Reserved Matters means the matters that the Directors have determined will not be delegated and will be dealt with exclusively by them; Sample 1.
What does approval of reserved matters mean?
Reserved matters are those aspects of a proposed development which an applicant can choose not to submit details of with an outline planning application, (ie they can be ‘reserved’ for later determination).
What are examples of reserved matters?
Examples of reserved matters include layout, access, scale and appearance of the development.
Is reserved matters a planning permission?
A Reserved Matters Approval is not a planning permission, Section 73 or S96A of the Town and Country Planning Act 1990 are not applicable when seeking to vary conditions imposed on Reserved Matters Approvals.
What does Reserved matters mean on a planning application?
A reserved matters application deals with some or all of the outstanding details of the. outline application proposal, including: • appearance – aspects of a building or place which affect the way it looks, including the. exterior of the development.
What are reserved matters in company law?
Under a shareholders’ agreement, the parties can provide that certain matters require shareholder approval in any number of possible variants (so by a majority, a specified percentage or unanimity). These matters are often referred to as reserved matters.
How long does Reserved matters take?
within 8 weeks
Timeline. The application for Approval of Reserved Matters should be approved within 8 weeks. This begins when the Local Planning Authority accepts the application as valid. This can be up to 13 weeks for larger developments.
What are the 5 reserved matters?
In relation to an outline planning permission, or an outline planning application, reserved matters can include any of the following matters:
- Access. Access to and within the site, circulation routes and how these fit into the surrounding access network.
- Appearance.
- Landscaping.
- Layout.
- Scale.
How long do reserved matters last?
Reserved matters applications should be submitted within 3 years of outline permission being granted. Outline planning permission lasts for two years from the date reserved matters were approved, or three years from the date of the outline planning permission, whichever is the later.
Why are reserved matters important?
It provides a form of control or protection for those with a minority stake who may not otherwise be able to veto or influence decisions on those matters if the approval threshold is only that applicable under general law. These reserved matters are generally actions outside the company’s ordinary course of business.
How do reserved matters work?
Reserved matters are the details that you – or whoever put in the original application (eg, the previous owner of the land) – have chosen to leave out of an outline planning application. They can include: Access. Appearance.
Can you condition a reserved matters application?
If a reserved matters application is submitted which includes details seeking to discharge a condition, then both applications will normally be delayed until the required fees are paid and the documents are organised into two separate applications.